Home / The Challenge


When installing network cabling the challenge can be meeting deadline pressures such as minimal installation time, out of hours working, strict access controls, storage or sometimes the necessary available skill set to terminate and test on site. Our solution is a pre-terminated system where each cable is tested by xSiCute in a controlled factory environment before being delivered to site enabling:

  • Significantly reduced installation time & labour costs for fast network deployment. Up to 75% less time than field termination methods.
  • No site storage and reduced waste. Up to 80% less packaging and no termination scrap material or debris to dispose of.
  • 100% Factory tested and inspected enabling plug and play.
  • Supplied with test certificate and fully traceable.
  • Fast turnaround from quote to delivery.
  • Access to unrivalled expertise and experience. 

See our article on the benefits of Pre-Terminated assemblies in the October 2019 edition of Networks Europe Magazine by clicking here.